Scheduling Document Generation
  • 14 Mar 2024
  • 1 Minute to read
  • Dark
    Light
  • PDF

Scheduling Document Generation

  • Dark
    Light
  • PDF

Article Summary

Schedule a Document

A document can be scheduled to be generated at the user's preferred date and time.

  1. Click Schedule in the context menu of an existing configuration
  2. Click Add
  3. Enter a name to the scheduling configuration and choose the document type

When selecting document types such as Executive summary, Billing details, Cost comparison, or Resource Auditing, it is essential to also choose the currency type in which the cost details for those documents are to be displayed.

  1. Define the recurrence period during which the document is to be generated
  2. Click Save

The billing date range under the Document type section has a maximum time interval of 90 days.

2.gif

Managing schedules

  • Users can toggle off the schedule to disable it. By default, the added schedule will be enabled with the toggle on.

  • Users can edit and delete the schedule via options available in the Schedule configuration blade.

Manage.png


Was this article helpful?